RA Taurus TX5 – COPPER CONCENTRATE MILL – Chile

RA Taurus TX5 COPPER CONCENTRATE MILL – Chile Taurus TX5 was used for internal repairs requiring fast-curing application. The rapid curing allowed the repairs to be completed on time, even during short plant shutdowns. Operating Conditions Ambient temperature Objective TX5 protection and restoration of surfaces with rubber,ceramic rubber, and worn steel. Location Chile Details of […]

RA Taurus TS4 – Acid Pump Copper Mine

RA Taurus TS4 – Acid Pump Copper Mine Taurus TS4-RC was used to protect the equipment against the high corrosion present in the copper flotation process.First, a layer of Taurus TS4-RC in red was applied, which is easy to apply by brush or by spraying with Sulzer cartridges.Afterwards, a second layer of the same product […]

RA Taurus Bandage Kit Ultra – Mine – Peru

RA Taurus Bandage Kit UltraMine – Peru Leaking Pipeline This report presents the application of the Taurus Bandage Ultra Kit, an advanced leak repair system for pipelines, designed for fast and safe interventions, even under active pressure. The purpose of the intervention was to restore the operational integrity of the line in a short timeframe, […]

RA Taurus TX5 & TS2 – Concentrate Pipeline Protection to Flotation Cell – Chile

RA Taurus TX5 & TS2Concentrate Pipeline Protection to Flotation CellChile Protection of copper concentrate transport pipeline to flotation cell. Taurus TX5 was installed along the entirecircumference of the pipeline to ensure total control of abrasion caused by high-velocity copper concentrate. TS2 provides a thin, brush-applied ceramic epoxy layer to protect against corrosion, improving internal pipe […]

RA Taurus TX5 – Rougher flotation cell Mine – Chile

RA Taurus TX5Rougher flotation cell Mine – Chile The Rougher flotation cell received internal repairs using fastcuring Taurus TX5.Thanks to its accelerated curing time, it was possible to complete all interventions within the established timeframe, even during short plant shutdowns. Operating Conditions Ambient temperature Objective TX5 – protection and restoration of worn rubber and steel […]

RA Taurus TS2 – Water storage tanks and Cistern – Dominican Republic

RA Taurus TS2Water storage tanks and CisternDominican Republic Industrial water storage tanks and water cistern needed a topcoat to protect the concrete substrate. Taurus TS2 was chosen for it’s FDA compliance along with ease of use when dealing with concrete. While normally you would need a primer to seal the concrete surface before applying a […]

RA Taurus TX2 & TX5 – Rougher Flotation Tail Box Mine – Chile

RA Taurus TX2 & TX5Rougher flotation Tail Box Mine – Chile In the Rougher Flotation Tail Box, Taurus TX2 was used to carry out the external repairs of the boxes. In the internal areas, fast-curing Taurus TX5 was applied. Thanks to its accelerated curing, it was possible to complete all repairs within the established timeframe, […]

RA Taurus TX5 – Dredge Pump – Ecuador

RA Taurus TX5Dredge Pump – Ecuador Customer feedback (Letter from the Dragando por el Guayas Consortium). The recommended TAURUS TX Series coating was used from May 28, 2024, until the completion of the dredging in April 2025. The application was carried out on the main dredging pump, which operated with river water loaded with highly […]

RA Taurus TX2 & TX5 – Flotation Rougher transfer box – Chile

RA Taurus TX2 & TX5Flotation Rougher transfer box – Chile Taurus TX2 was used for external repairs of the boxes. In the internal areas, fast-curing TX5 was applied. The rapid curing allowed the repairs to be completed on time during short plant shutdowns. Operating Conditions Ambient temperature Objective TX2 – cold repair of leaksTX5 – […]

RA Taurus TX2 & TX5 – Flotation Rougher – Chile

RA Taurus TX2 & TX5Flotation Rougher – Chile The Rougher flotation tailing box underwent complete repairs using two different technologies.Taurus TX2 was applied to the external repairs, while fastcuring TX5 was used in the internal areas. Thanks to its rapid curing time, all interventions were completed on schedule, even during short plant shutdowns. Operating Conditions […]